Wednesday, 26 December 2018

Nuclear's carbon contribution is overlooked

Letter sent to The New York Times:
In his op-ed “Cut Carbon Through Innovation, Not Regulation,” (New York Times, Dec. 18; https://www.nytimes.com/2018/12/18/opinion/climate-carbon-tax-innovation.html) Senator John Barrasso astonishingly stated “Nuclear energy is produced with zero carbon emissions.”

As chairman of the Environment and Public Works Committee and member of the Energy and Natural Resources Committee, he will have access both to expert committee advisors as well as the erudite staff of the Library of Congress.

Had he consulted either, he would have been told production of nuclear electricity is not carbon free, because the production of nuclear fuel for these reactors is significantly energy intensive.

While it is true that most nuclear reactors do not emit CO2 at the point of generation, reactors are a small part of the nuclear fuel cycle, which emits large amounts of CO2.

These arise from the so-called front end of the fuel cycle - uranium mining, ore milling, uranium hexafluoride conversion, fuel enrichment and, finally, fabrication of the fuel rods. Moreover, nuclear waste management at the "back end" is already energy hungry in treatment, conditioning, transportation and final disposal in some future repository (if Congress ever give the green light).

Thus life-cycle analyses are essential to assess the true impact of the entire processes.

A number of such studies have examined CO2 emissions - commonly expressed as CO2 equivalents per kWh - for different methods of producing electricity. The most comprehensive model has been created by the Öko Institut, which advises the German environment ministry, and by Professors Smith and Van Leeuwen at the University of Groningen, in the Netherlands.

Öko's analysis shows that nuclear CO2 emissions are up to four or five times greater than those from renewables.

Tuesday, 25 December 2018

Concrete cracks threaten smoothstart to a nuclearised Gulf


 
Barely a month ago, the Emirates Nuclear Energy Corporation ENEC) issued an upbeat
media release celebrating the completion of main concrete works and heavy equipment
lifting at Barakah Nuclear Energy plant - which uses the state-of-the-art APR1400 design
- in the Al Dhafra Region of Abu Dhabi.
(ENEC Achieves Historic Milestone in Construction of Barakah Nuclear Energy Plant,
media release, 14 November 2018;
https://www.enec.gov.ae/news/latest-news/enec-achieves-historic-milestone-in-
construction-of-barakah-nuclear-energy-plant/)
ENEC stressed how “more than 2.3 million cubic meters of concrete [had been] poured
 and approximately 250,000 metric tons of rebar (reinforcing steel) installed at Barakah
Nuclear Energy Plant.”
“These milestones are the result of the exceptional partnership between ENEC and its
Prime Contractor and Joint Venture partner KEPCO (Korea Electric Power Corporation
 KEPCO) with the dedication and expertise of our UAE Nationals and international
experts,” added Eng. Al Hammadi, Chief Executive Officer of ENEC.
But behind the scenes, the reality was different. The Barakah plant, being built by a
  South Korean consortium  including Korea Hydro & Nuclear Power (KHNP), Hyundai
Engineering & Construction, Samsung C&T, and Doosan Heavy Industries & Construction,
 was facing serious  difficulties. Barakah Unit 1 has still not received an operating licence
 and is now predicted to begin commercial operation in 2020, some three years later than
 initially planned
Nearly a month  earlier, in mid-October,  the Korean media had revealed significant
problems had been discovered in the poured concrete, with cracks emerging in the
 containment buildings  of two out of the 4 reactor units.(KEPCO undergoes repairs for
cracks in nuclear reactor containment buildings in UAE
 http://english.hani.co.kr/arti/english_edition/e_business/866228.html; Hani News, 17 October 2018)
The Hankyoreh (‘One nation news’reported that the Korean parent company had been
carrying out repair work after the discovery of cracks.
.
During a parliamentary audit by the Trade, Industry, Energy, SMEs and Startups
Committee of the Korean National Assembly (Parliament) on  16 October, the CEO
of KEPCO, Kim Jong-gap under interrogation  by Democratic Party lawmaker Woo
Won-shik  revealed that  “[Construction] has been halted on the UAE power plants
because of the discovery of cracks.” Mr Kim also explained that South Korea’s low
rate of nuclear power usage over the past one to two years had been due to a need
for repair to cracks and corroded plates resulting from poor construction in the past.
 
Hankyoreh revealed that cracks had first been discovered at Barakah in August 2017,
  with the first being found in the containment building for the No. 3 unit. A subsequent
examination was conducted on the buildings for the No. 1, 2, and 4 reactor units,
resulting in the discovery of cracks in all of them, the newspaper reported.
This extent of cracking was denied in an official statement from ENEC issued on 4 December. (“Quality Assurance in Action at Barakah Nuclear Energy Plant, https://www.enec.gov.ae/news/announcements/quality-assurance-in-action-at-barakah-nuclear-energy-plant/), claiming no cracks (described as “voids”) had been identified in units I and 4, with only  “minor” voids discovered in unit 2,  but admitted that “concrete voids were identified during the construction phase of Unit 3 ..detected by KEPCO , and verified by ENEC.”
ENEC added that as the Construction License holder, it had officially notified the UAE nuclear regulator, the Federal Authority for Nuclear Regulation (FANR) and “a thorough investigation process commenced” involving “engagement from KEPCO and the Hyundai Samsung Joint Venture (HSJV), as well as an independent expert on concrete contracted by ENEC, to verify the results of the investigation.”
Throughout the process, FANR has been regularly updated, and reviewed the repair plan and repair works on Unit 3, which are scheduled for completion by the end of 2018.
Last week, the US-based specialist newsletter, Energy Intelligence (“Newbuild: Has Barakah Lost Its Magic”? Energy Intelligence, 7 December 2018,
http://www.energyintel.com/pages/eig_article.aspx?DocId=1018264&NLID=104, through its reporters Stephanie Cooke in Washington and Oliver Klaus in Dubai, took the story forward with exclusive new revelations after a month-long investigation.
 
E.I. reported that ENEC's 4 December press statement had only released after weeks of email exchanges between the newsletter’s reporters and ENEC over the nature and extent of the problem.
Uncorrected cracking in the containment building of any nuclear reactor risks a radiological release to the atmosphere, particularly in the event of a severe accident. But E.I stresses that even if the cracks are easily and quickly repaired, their existence reveals construction problems that went unmentioned in ENEC's previous statements.
However cracking in the thick pre-stressed, steel-lined concrete wall of the containment building  of Unit 3 could be more serious than ENEC is letting on, according to E.I’s investigation., The director-general of the UAE's Federal Authority for Nuclear Regulation (FANR), Christer Viktorsson told the  newsletter exclusively  in  an  interview on 21st November that he had in fact  learned about the problem last year after testing at the unit revealed grease leaking out of the wall, but conceded the safety regulator initially was not informed of the discovery.
Grease is the word
An anonymous nuclear  industry expert told E.I. reactor containment buildings typically include heavy-duty metal cables, known as tendons - that run through long steel-lined channels inside the exterior wall,” and are on reels so they can be winched up or down to adjust the tension. "Those tendons have to be periodically inspected during plant operation; the reels are used to create tension and are under a great deal of stress. Typically the channels contain a reservoir of grease to make them more easy to winch up and down."
Mr Viktorsson added that grease "started to come out in unexpected places" and workers "saw that there was a void in the containment in a certain place." Asked if the problem at Unit 3 was reported to the IAB, Viktorsson said, "No. To us, with an action plan. So they said 'we will fix this of course'; so we followed it and made sure that it's being corrected." Viktorsson stressed "this is of course something that they need to fix before we give them an operating license."
ENEC claimed in an email sent  to E.I. on 23 October that FANR  had been officially notified "and a thorough investigation commenced, “ adding  “Throughout the process, FANR has been regularly updated, and reviewed the repair plan and repair works on Unit 3…"
While Enec claimed that this work is "not anticipated to impact the project schedule" the unnamed industry expert argued that the few details provided suggest the possibility of a leakage path from inside the cable channel, through the steel liner, and out to the concrete exterior
In a critical observation, E.I concluded “With the cracking problems and other technical issues posing challenges for the project's developers, the aura of a smoothly run project that has long surrounded the [Barakah plant] may be fading. These issues are in stark contrast to the numerous glowing progress reports by both ENEC and Abu Dhabi's International Advisory Board (IAB), which was disbanded after a final meeting in October 2017 on the basis that its mandate to lead the UAE "through the technical and political complexities of the concept and construction phases" of the project had been fulfilled. It now seems clear that the technical complexities proved greater than anticipated, and were not fully understood by the board at the time it decided its mission was complete.”
 
 
Korean cracks foreshadowed UAE problem
 
After cracks were discovered at numerous nuclear power plants in South Korea –at first at the Hanbit 2 plant – KHNP and the Nuclear Safety and Security Commission (NSSC) explained that the “construction capabilities were not up to par two decades ago.”
 The UAE initially decided to have the plant built using South Korean methods, adopting the model of the Shin-Kori 3 and 4 reactors using the APR1400. In South Korea, the APR1400 is used with Shin Kori reactors 3 to 6 and Shin Hanul reactors 1 and 2.
“It’s shocking to learn cracks were discovered even at the state-of-the-art UAE nuclear power plant,” said Woo Won-shik, adding that an “investigation of the Shin Kori 3 and 4 reactors used as a pilot model for the UAE plant appears unavoidable,” Hankyoreh reported.
Reuters reported on 22 November  that French energy group EDF (and Nawah Energy - a JV subsidiary in charge of operations for preparation to operate, pending regulatory approval - have signed a deal to operate and maintain the delayed Barakah power plant. (“EDF, UAE's Nawah sign deal on operating Barakah nuclear plant,” https://uk.reuters.com/article/uk-emirates-nuclearpower-edf/edf-uaes-nawah-sign-deal-on-operating-barakah-nuclear-plant-idUKKCN1NR1MO?rpc=401&)
ENEC failed to respond to a request for comment for this report.
Backstory
 
In December 2006 the six member states of the GCC – Kuwait, Saudi Arabia, Bahrain, the UAE, Qatar and Oman – announced that the Council was commissioning a study on the peaceful use of nuclear energy. France agreed to work with them on this, and Iran pledged assistance with nuclear technology.
In February 2007 the six states agreed with the IAEA to cooperate on a feasibility study for a regional nuclear power and desalination program. Saudi Arabia was leading the investigation. Regional electricity grid integration is progressing.
The six nations are all signatories of the NPT and the UAE ratified a safeguards agreement with IAEA in 2003. In mid-2008 it appointed an ambassador to IAEA.
Nuclear power program in the UAE
The UAE in 2015 produced 127 TWh of electricity, all from fossil fuels – 125.5 TWh natural gas, and 1.5 TWh oil. There were no imports and virtually no exportsa. Electricity demand is growing and the country relies entirely on electricity to provide its potable water, by desalination.
In April 2008 the UAE independently published a comprehensive policy on nuclear energy. This projected escalating electricity demand from 15.5 GWe in 2008 to over 40 GWe in 2020, with natural gas supplies sufficient for only half of this. Imported coal was dismissed as an option due to environmental and energy security implications. Renewables would be able to supply only 6-7% of the needed power by 2020.
 
>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 
Other related materials
UAE’s Barakah nuclear energy plant unit 2 passes pre-operational test
 
Power Magazine, 7 August 2018
https://www.power-technology.com/wp-content/uploads/sites/7/2018/08/Barakah.jpg
 
UAE’s Emirates Nuclear Energy Corporation (ENEC) has announced the completion of hot functional testing (HFT) on unit 2 of the Barakah nuclear energy plant.
For this test, ENEC has worked closely with the Korea Electric Power Corporation (KEPCO), which is the joint venture (JV) partner as well as the prime contractor for the Barakah project.
ENEC noted that the pre-operational testing process was carried out by incorporating all lessons learned from the same test on unit 1 in order to achieve international standards of quality, safety and efficiency.
"By incorporating the lessons learned from the same tests on unit 1, we continue to establish Barakah as the benchmark for new nuclear construction projects worldwide."
The HFT was conducted under the observation of the UAE’s independent nuclear regulatory body Federal Authority for Nuclear Regulation (FANR).
During the test, components were checked for thermal expansion, vibration and wear. The results demonstrated that all systems performed in accordance with the quality and safety standards under normal operating conditions.
ENEC CEO Mohamed Al Hammadi said: “We are proud to have maintained our track record of safety and efficiency with the successful completion of hot functional testing on unit 2.
“By incorporating the lessons learned from the same tests on unit 1, we continue to establish Barakah as the benchmark for new nuclear construction projects worldwide.
“Keeping construction progress approximately one year apart for each of the units at Barakah makes it possible for us to implement all lessons learned from one unit to the subsequent ones, in line with international best practices in the management of megaprojects.”
Construction works on unit 2 of the Barakah nuclear energy plant began in April 2013, one year after unit 1.
Unit 1 has been handed over to Nawah Energy Company (Nawah), a JV subsidiary in charge of operations for preparation to operate, pending regulatory approval.
Barakah nuclear energy plant, which features four units, is reported to have progressing safely and steadily and will deliver safe, clean, reliable and efficient electricity to the UAE grid.

Monday, 24 December 2018

Plutonium proliferation with impunity introduced by UK Government, post-Brexit

Letter sent to The Observer:

Adam Vaughan’s excellent assessment of the long-term, expensive failure of the reprocessing ‘atomic adventure’ at Sellafield suggests that the plutonium extracted by using the recently closed Thermal Oxide (Thorp) reprocessing plant was extracted “for bombs.” (“Sellafield, once star of a ‘new atomic age,’ scrubs up for a different future,” 16 December; https://www.theguardian.com/business/2018/dec/15/sellafield-thorp-reprocessing-uranium-hazard-cleanup ).

I have no doubt Sellafield’s owners, the state-owned Nuclear Decommissioning Authority (NDA), would deny this. However the truth is complex, but very important, and has significant Brexit fallout complications.

Under a new so-called “voluntary safeguards agreement (VOA) signed on 7 June this year between the UK and the UN international  watchdog, the International Atomic Energy Agency (IAEA), to replace the existing trilateral agreements between UK-IAEA and the EU  nuclear watchdog  body, Euratom, under Brexit arrangements, it includes in its very first article, the following exclusion:

“The United Kingdom shall accept the application of safeguards, in accordance with the terms of this Agreement, on all source or special fissionable material in facilities or parts thereof within the United Kingdom, subject to exclusions for national security reasons only, with a view to enabling the Agency to verify that such material is not, except as provided for in this Agreement, withdrawn from civil activities.” (emphasis added)
(https://www.gov.uk/government/publications/ms-no132018-ukiaea-agreement-for-application-of-safeguards-in-connection-with-treaty-on-the-non-proliferation-of-nuclear-weapons)

Lest anyone thinks this is simply an enabling option, very unlikely to be implemented, we know from Parliamentary answers and annual publications by the UK nuclear regulator, the Office for Nuclear Regulation, under the predecessor trilateral agreement ( in force from September 1978), which this new treaty replaces, there have been several hundred occasions when nuclear materials, including plutonium, has been withdrawn from safeguards cover.

A written answer to Green Party MP Caroline Lucas  on 17 December (200104) by foreign office minister, Sir Alan Duncan, withdrawals year by year since 1999 were as follows: in 2000 there were 6; in 2001, 18; in 2002, 11; in 2003, 20; in 2004 19; in 2005, 17; in 2006, 16; in 2007, 31; in 2008, 19; in 2009, 15; in 2010, 14; in 2011, 17; in 2012, 19; in 2013, 34; in 2014, 18, in 2015, 29; in 2016, 44 and in 2017  35 withdrawals.

The international treaty that put this  agreement into law  was passed unopposed by MPs on Monday this week, de facto legitimising  large scale plutonium proliferation with impunity by the UK Government.
 
Just imagine if North Korea or Iran were to try to do that!

Saturday, 22 December 2018

Droning on: ministerial complacency a real worry

Letter sent to Daily Telegraph:
Transport minister Baroness Suggs displays considerable complacency in her Commentary on drone dangers (“New rules and technology will help us stop malicious disruptions,” Daily Telegraph, December 21; https://www.telegraph.co.uk/politics/2018/12/20/must-clamp-malicious-drone-use-protect-people-abusing-new-technology/).

Over a year ago, responding to a question on drones from Baroness Randerson, she said”

“it is sometimes a challenge to link an operator to a drone. We are trying to help address that by introducing a registration system, and we are investigating electronic identification. We are looking at putting powers in the legislation for the police to require drone users to produce registration ID and documents and to land their drones, and to search for and seize a drone when there is reasonable belief that a crime has taken place. We very much hope that that will enable police to capture people who are misusing drones.” (Hansard, 17 November 2017; https://hansard.parliament.uk/Lords/2017-11-21/debates/61653AD3-DFF0-4E10-8DDF-020355C3E7DB/Drones)

 

A year earlier, another peer, Lord Harris, published his report for the London Mayor on terrorist threats, which included the following conclusion and recommendations:

“the Civil Aviation Authority should, building on the work of the House of Lords review into the civil use of drones, ensure that the current legislation relating to the use of drones is suitable. Government should also explore technological options to improve the capacity to restrict drone use or disable them. (https://www.london.gov.uk/sites/default/files/londons_preparedness_to_respond_to_a_major_terrorist_incident_-_independent_review_oct_2016.pdf)

 

Moreover, as Labour backbencher Paul Flynn MP raised in a question on drone risks in April 2016 in the House of Commons, there is also the spectre of a drone attack on critical energy infrastructure, such as nuclear power plants, in a question on drone risks, to be dismissed by the then Transport Secretary Patrick McLoughlin: “There is no complacency whatever from the Government on the use of drones.”( Hansard, 28 April 2016; https://hansard.parliament.uk/Commons/2016-04-28/debates/16042846000013/Drones(SafetyRisks)

 

It seems he was wrong!

Friday, 21 December 2018

Drone Dangers: from airports to nuclear power plants

Thirty months ago I researched and wrote a briefing on insecurities in the nuclear industry, which was published as a briefing by the Nuclear Free Local Authorities. Below is an extract from the  section on drone dangers, which I think in light of the Gatwick Airport  incident, needs to be careful re-examined. [my thanks to Neil Crumpton, on whose original research I based this  work]

http://www.nuclearpolicy.info/wp/wp-content/uploads/2016/05/A258_NB145_Nuclear_Security_concerns.pdf

The fast emerging threat from drones
The first innovative, small drone attack by a malicious / radical group will inevitably be a wake-up
call to public and politicians. This new security threat was not present when the Government‘s
National Policy Statement (NPS) on nuclear power facilities was published in 2011. In 2015,
drones were flown close to a number of French nuclear facilities and the security agencies were
not clear in the initial phase the identity of those actually using them. This is a perfect example of
how unexpected nuclear security threats from drones could be. (35)
The fast emerging 'drones' threat, and the enhanced threat from malicious groups more generally,
would suggest that the size of the site area should be reviewed in terms of 'defence-in-depth'
security and public safety in any review of the UK Government‘s national policy statement on
nuclear generation. An increase of the in-site area, potentially clear-felled to facilitate the safe
A258 (NB145) – NFLA Briefing No 145 Nuclear security 9
elimination of drones threatening a site, may have significant implications for sites adjacent to
populated urban areas, (e.g. Hartlepool), proposed sites for decentralised Small Modular Reactors
(SMRs), and sites near or constrained by protected areas e.g. Sites of Special Scientific Interest
(SSSIs).
The Government‘s Nuclear National Policy Statement (using ONR guidelines) currently
recommends a site area of 30-50 hectares per (around 1.6 GW) reactor/store with regard to
defence-in-depth site security (defined by IAEA), decommissioning area, etc. So a new nuclear
reactor - 2.8-3.4 GW twin / triple project - might require a site area (enclosed by the perimeter
fence) to be around 60-100 hectares or more. The actual buildings area footprint of a twin / triple
reactor project might be around 10 hectares of the perimeter site area. Presumably coastal sites
with no public beach access and a (marked) seaward exclusion zone might require a smaller
secure land area.
The average drones available at present could potentially carry a few kilograms of shaped
demolition charges, shrapnel, poison gas, petrol, chaff, glue, booby-traps, decoys, distraction
devices, and so on. One heavily-ladened small drone could probably travel at least 20 mph (9
meters per second) with a load of 5-10 kg. Just one 5 kg shaped charge can penetrate 0.75 meters
(30 inches) of reinforced concrete, or 0.25 meters (10 inches) of steel. (36)
Lone, several or mass drone attacks, some pre-programmed and perhaps controlled from remote
locations, could be potentially staged against nuclear stations, fuel and waste transports or other
sites such as reprocessing and surface waste repository facilities. Other drones could video the
proceedings for download to the internet for the use of malicious groups. It may also be possible
that multiple or mass drone attacks could precede, be a distraction, or form part of an attack by
malicious groups or individuals with heavier demolition charges. It should be noted that just one 20
kg demolition charge can punch a hole through 1.5 meters of concrete. (37) The proposed Hinkley
Point C double dome concrete containment walls (dome over reactor and other critical areas) are
between 1.3 and 1.8 meters thick. (38) The spent fuel ponds and diesel back-ups proposed at the
site are behind a 1.3 to 1.8 metre wall. (39)
It is foreseeable that drones could be launched from vehicles parked close to perimeter fences and
could travel quickly, and or possibly stealthily, to a target. Site defence response times (i.e. target
acquisition-assessment-decision-action) would be minimal. In 20 to 40 seconds a drone travelling
at just 20 mph could cover between 180 to 360 meters. Some currently available drones can now
reach 50 mph (40) and are highly controllable and manoeuvrable at speed. (41) It could be very
difficult for on-site security forces to be able to stop such a threat from a single or multiple drone
attacks.
Drones have the potential to become a major weapon in asymmetric warfare in the 21st Century.
The unidentified flights over French nuclear stations in summer 2015 should be seen as a major
wake-up call for the nuclear industry. Military drones have been used to considerable effect by the
US, UK and Russia in Yemen, Syria, Iraq, Afghanistan and other countries, and by Israel above
Gaza.
Another important analysis of the threat from drones was published in March 2015 by Dr David
Lochbaum, currently the director of the Nuclear Safety Project for the Union of Concerned
Scientists. It argues drones can have positive utility for nuclear power plant safety, by carrying out
authorised aerial surveillance; but it also identifies malevolent drone hazards.
Dr Lochbaum writes: ―But drones have a potential dark side. Reports of drones buzzing around
French nuclear plants prompted considerable discussion about whether drones carrying explosives
could wreak damage. The short answer is yes. The longer answer is that the steps mandated by
the US NRC after the 9/11 tragedy, to reduce nuclear plant vulnerabilities to damage inflicted by a
piloted aircraft on a suicide mission, also protect against explosive-laden drones. The NRC‘s post-
9/11 upgrades did not eliminate the suicide aircraft threat entirely, however, and multiple explosive
laden drones might be able to overwhelm the upgrades.‖ (42)
In addition, drones could distract the plant‘s security responders. Similar to how military pilots use
countermeasures to confuse incoming missiles, ground-based attackers could employ drones to
lure security responders away from an attack route. In the ‗force-on-force‘ exercises conducted
periodically to test nuclear plant security capabilities, mock attackers penetrate fences and proceed
rapidly through the plant, simulating the destruction of equipment needed to cool the reactor core.
Security personnel respond to intrusion-detection alarms and to indications that locked doors have
been blown open by rushing to take defensive positions behind bullet-resistant enclosures—
located between the intruders and the remaining equipment that could trigger a meltdown if
sufficiently damaged
The exercises have demonstrated that the responders need not be delayed long to tilt the
advantage in favor of the attackers. Drones broadcasting loud sounds of explosions and gunfire,
for example, could confuse and slow down the responders. Likewise, collisions with the perimeter
fence—activating the intrusion-detection system—could send responders on time-consuming ‗wild
drone‘ chases. (43)
In a paper by the ‗Remote Control‘ project of the Network for Social Change, hosted by the Oxford
Research Group, they acknowledge that no single countermeasure is completely effective at
limiting the hostile use of drones by non-state actors. They therefore suggest that: ―…the United
Kingdom adopts a hierarchy of countermeasures encompassing regulatory, passive and active
countermeasures, which provides a layered defence. Regulatory countermeasures include point of
sale regulations, civil aviation rules and manufacturing standards and restrictions. Passive
countermeasures include early warning systems and signal jamming. Active countermeasures
include kinetic defence systems, such as missiles, rockets and bullets, and less-lethal systems,
such as projectile weapons and net guns. Each stage of the hierarchy of countermeasures requires
government action, but it is the regulatory countermeasures upon which it can affect the greatest
change.‖ (44)


(35) The Guardian, ‗Drones spotted over seven nuclear sites, says EDF‘, October 30, 2014




http://www.theguardian.com/environment/2014/oct/30/drones-spotted-over-seven-french-nuclear-sites-saysedf
 
 
(36) Global security.org http://www.globalsecurity.org/military/systems/munitions/bullets2-shaped-charge.htm



(37) Federal Business Opportunities.gov
 
https://www.fbo.gov/index?s=opportunity&mode=form&tab=core&id=8a5b5351149086437c6b80c5a284794a
 
 
(38) Areva design for EPR at Hinkley Point http://www.areva.com/EN/operations-5345/epr-reactor-prepared-forevery-




situation.html#tab=tab5
 
 
(39) Areva EPR design, page 5: http://pbadupws.nrc.gov/docs/ML0522/ML052280176.pdf

(40) Sensefly.com https://www.sensefly.com/drones/ebee.html

(41) You Tube https://www.youtube.com/watch?v=6zDDsX5xYcA



(42) Drones at nuclear power plants: enemies or helpers? See Bulletin of the Atomic Scientists, March23, 2015;
 
http://thebulletin.org/drones-nuclear-power-plants-enemies-or-helpers8132
 
 
(43) ―Most French Nuclear Plants 'Should Be Shut Down' Over Drone Threat,‖ Newsweek, 24 February 2015.

(44) Oxford Research Group, Network for Social Change‘s ‗Remote Control‘ project




https://sustainablesecurity.org/2016/03/04/how-to-respond-to-the-threat-from-hostile-drones-in-the-uk/

Sunday, 16 December 2018

Nuclear NPT is bad example for fossil fuel control treaty

Letter sent to The Guardian:

Hugh Richards is right to identify the need for a new global regime to control and reduce fossil fuel extraction and  use (‘We need a non-proliferation treaty for fossil fuels,” letter, 13 December 2018*; https://www.theguardian.com/environment/2018/dec/12/we-need-a-non-proliferation-treaty-for-fossil-fuels), especially in the week when the inter-governmental climate change conference in Poland (“EU’s climate pledge as UN chief says: ’We’re running out of time’,”13 December 2018).
But he is misguided to think the nuclear non-proliferation treaty  (NPT) is a suitable model.

This treaty, signed in July 1968, with the UK, USA and USSR (Russia) as depositary states, has gained  a huge membership ( over 190 countries signed up), but has been a disaster in  non compliance with its disarmament obligations, in particular the nuclear weapons states members, led by the UK

The NPT requires all its signatories, under Article 6, to  enter into negotiations - in good faith and at an early date -  to achieve nuclear disarmament under strict international verification.(https://www.un.org/disarmament/wmd/nuclear/npt/text/)
In the sixty years since signing the NPT, the UK has failed to enter a single nuclear weapon into any bilateral or multilateral nuclear disarmament  negotiation, demonstrating the deepest of bad faith.

All UK removal of nuclear weapons has been done unilaterally.
Ironically the British Foreign Office this week has been running an elite four-day conference at its specialist conference centre at Wilton Park, at a bargain fee of just £1490  per participant(‘The nuclear non-proliferation regime towards the 2020 NPT Review Conference’, https://www.wiltonpark.org.uk/wp-content/uploads/WP1633-Programme.pdf)

The focus seems to  have been on excoriating  non- nuclear weapons countries ( such as Iran) over alleged or potential proliferation, by countries such as the UK  who have massive  nuclear capability to kill millions, but refuse to meet their NPT legal obligations.




*We need a non-proliferation treaty for fossil fuels
‘Peaceful use’ of fossil fuels could mean their continued but decreasing extraction, within enforceable limits constrained by the Paris agreement goals, writes Hugh Richards
A pumpjack operating during sunrise near Gaenserndorf, Austria
A pumpjack operating during sunrise near Gaenserndorf, Austria. Photograph: Christian Bruna/EPA
In the face of the emerging climate emergency (Letters, 10 December) and projected unconstrained growth in global fossil fuel use, this is a plea for people with relevant expertise and influence to take forward the idea for a “non-proliferation treaty” (NPT) for fossil fuels, floated by Andrew Simms and Peter Newell (theguardian.com, 23 October) and supported by Bill McKibben, Naomi Klein and others (Letters, 30 October).
The analogy between fossil fuels and fissile nuclear materials is imperfect, but it should not be overlooked that the nuclear NPT promotes cooperation in and equal access to “peaceful use” of nuclear technology. “Peaceful use” of fossil fuels could mean their continued but decreasing extraction, within enforceable limits constrained by the Paris agreement goals, and an offsetting role for carbon capture and geo-sequestration (funded by fossil fuel producers). Safeguards and oversight could be provided by a new United Nations monitoring agency, akin to the International Atomic Energy Agency, which could also administer a global fossil carbon budget.
Fossil fuel companies extract their products where relevant governments permit. The number of nations permitting extractions on scales that threaten all of us is greater than the number of nuclear weapons states, but it is nevertheless small. This could make rapid negotiation of a fossil fuel “NPT” relatively tractable. It would not even have to include all producer nations at first to be effective.
Hugh Richards
Stroud, Gloucestershire